Project whole-process consultancy and management and supervision
1、項目實施準備階段 Phase1. Preparing
主要包括:申辦立項、編制項目建議書、可行性研究報告、土地測量、編制項目設計委托書、設計方案的技術經濟分析、規劃報批、申辦施工圖審核、消防和環保等審批手續、申辦施工用電用水、落實施工場地平整、申辦質安監委托手續、申辦規劃許可證、申辦施工許可證、申辦規劃驗線等。
Main service: Project Application, Compile Project Suggestion, Feasibility Report, Land Survey, Design Attorney Report, Providing Technical and Economic Analysis of Design Proposal, Planning Approval, Appling for the Construction Drawing Approving, Apply Fire Hydrant and Sanitary Approved File, Apply the Right of Running Construction Water and Electricity. Checking the site indeed leveled, bidding for Quality Supervision Attorney files, Apply the Planning Permission, Construction Permission and Axial Line Acceptance.
2、工程招標階段 Phase2. Bidding
策劃招標方式、編制招標文件、明確建設標準及主要材料設備品牌、編制項目清單及控制價、組織工程報建、發布招標公告、進行資格預審、組織招標答疑、組織開標評標、發放中標通知書、起草合同條款并協助簽訂合同。
Scheme the proper bidding type, bidding documents, clarifying the construction standard and main material and equipment, compile project list and price control, organize project application, announcement of tenders, conduct pre-qualification, organize tender documents answering, organize bid opening and evaluation, issue letter of acceptance, draft the contract and assist to sign it.
3、工程施工階段Phase3. On-Supervision
項目施工過程中的質量控制、進度控制、投資控制、合同管理、信息管理、安全文明施工管理、各專業單位之間的銜接和協調組織。
Quality control, progress control, invests control, contract, information, safety and civilized construction management, connection and coordination between each party during project construction process.
組織圖紙會審、技術交底、分部工程驗收、申辦自來水、供電、雨污水、有線電視、電話、煤氣等管線的施工及接通手續、組織竣工驗收及移交、申報規劃、環保、消防等各項驗收、竣工資料歸檔移交及竣工備案。
Organize drawings checking, detail-telling, subproject inspection and acceptance. Bid for pipeline construction and connect procedures of running water, power supply, storm sewage, CATV, telephone, gas etc. Organize completion acceptance and hand over, declare for various inspections and acceptances of programme, environmental protection, fire protection etc. Completion materials archiving, handing over and completion filing.
4、建設后期及保修階段Phase4. After constructed
申辦不動產證,組織工程決算審核、辦理項目結算,落實解決遺留整改問題,協調解決保修階段暴露出的問題。
Bid for land certificate, review project cost and items settlement,implemente resolve remaining problems rectification, coordinate and solve problems during warranty period.